Pre-Construction
"A project’s success is decided before ground breaks."
Pre-Con integrates design, budget, and risk reviews to improve predictability and project profitability.
WHY PRE-CONSTRUCTION?
"A project’s success is decided before ground breaks."
About 70% of a project’s success is determined before construction starts.
Pre-Construction integrates design, budget, and risk reviews to remove uncertainty and maximize predictability and profitability.
DAN A&C reviews projects from both design and construction perspectives to achieve the optimal balance of cost, schedule, and quality.
PRECON PROCESS
Pre-Con Process
Structured pre-con management based on logic and data
Feasibility Review
Review site, usage, regulations, and budget feasibility
Design Coordination
Analyze design intent and constructability review
Cost & Schedule
Cost estimating, schedule simulation, Value Engineering (VE)
Risk Management
Identify key risks and plan proactive responses

OUR APPROACH
Collaborative, Smart Pre-Con
"Pre-Con is not a simple pre-review—it is the stage where we forecast and design the entire project."
DAN A&C bridges designers, builders, and owners with a collaboration-focused Pre-Con service.
From the earliest planning stage, we run data-driven simulations to prevent budget overruns, schedule delays, and design-change risks.
Pre-Con Here’s what changes with DAN A&C
Predictable Outcomes
Remove risks before ground-breaking and prevent cost overruns.
Optimized Design
Minimize conflicts between design and construction for efficient outcomes.
Efficient Budgeting
Provide precise estimates and VE proposals based on construction realities.
Stable Schedule
Prevent schedule delays through pre-simulation.
"Before starting a project, we draw a more complete picture."
DAN A&C’s Pre-Con reduces uncertainty and expands possibilities.